S130 | |
WW2 German Schnellboot Restoration | |
Reconstruction - Part 2HullTimber Work |
July-August 2010 |
Stem and Forefoot |
The stem and forefoot have been subjected to some considerable number of repairs of varying quality which has left a rotten and weakened structure that needed replacing. |
The bow is supported with cradling and shores |
The profile of stem and forefoot are lofted to full size and patterns lifted |
The old forefoot is cut away and the keel scarph formed |
A new piece is cut, shaped and made ready to be scarphed into place |
A new oak stem knee is made to which the forefoot and stem will be fastened |
Steel rivet headed bolts are forged, using a die plate, threaded and heavy galvanised for bolting the forefoot and stem assembly |
|